Presentation High School
San Jose, CA
-
Project Status
Completed 2014
-
Design Lead
Kirk McKim & Todd Walter
Details
This project involved the addition of a 2nd floor on top of an existing single story locker building. The 2nd floor consists of 6 CR, 3 offices, 1 work room and a utility room. The 1st floor was left as is and we provided some renovation. We added a bridge to connect the 2nd floor to an existing 2-story classroom to link both buildings and provide easy access for students and faculty.